The growth in demand for products in the frozen sector led to the need for a new cold store at Digrom Immo Zundert. Construction was recently completed. This is the second warehouse on the same site for the Zundert-based company. Their previous warehouse opened in 2015.

In the new cold store stow has finished the construction of a Pallet Shuttle installation. The project took 4 months and has a capacity of 33000 industry pallets of vegetables of 1250 kg.

This installation contains 6 levels of racking and an add-on portal construction. Special feature: there are different depths, some of 36 meters.

Pallet shuttle racking in Zundert, The Netherlands